Business flow

Business flow

We integrate the entire processes from proposal to contract including shipment, test run and delivery for the purpose of reducing the customer’s time and effort so that we can offer our high-quality bulk handling system.

Business flow

Lead time from inquiries to delivery(for your reference)

  • STEP01

    Inquiry
    (Initial Consultation)

  • 1~3Weeks
  • STEP02

    Proposal
    (Quotation)

  • 1Month
  • STEP03

    Firm order

  • 3~8Month
  • STEP04

    Delivery

STEP01

Inquiry(Initial Consultation)

We carefully listen to our customers' requirements.
  • We accept consultations and concerns regarding powder transport and valve systems
  • We conduct detailed interviews about equipment usage, types of powder to be processed, installation environment, etc.
  • When on-site surveys are necessary, our engineers visit to confirm the current conditions
  • We determine proposal strategies that align with customers' budgets and schedules
Consultation Services We Can Provide
  • New installation and renovation of powder transport equipment
  • Valve selection and replacement
  • Efficiency improvement and automation of existing equipment
  • Design and manufacturing of ship cargo handling equipment
1~3Weeks
STEP02

Proposal(Quotation)

We propose optimal solutions.
  • Based on interview content, we conduct technical studies and design
  • We propose optimal equipment and systems that solve customers' challenges
  • We provide detailed specifications and technical documentation
  • We create transparent quotations and explain cost breakdowns
Contents Included in Proposals
  • System configuration diagrams and layout drawings
  • Specifications and performance of main equipment
  • Construction methods and process planning
  • Maintenance and servicing plans
  • Detailed quotations
1Month
STEP03

Firm orde

Comprehensive support from design to manufacturing.
  • We begin detailed design after contract signing
  • We finalize specifications through repeated consultations with customers
  • We conduct manufacturing and assembly at our own factory
  • We maintain thorough quality control and conduct inspections at each process stage
Activities During This Period
  • Creation and approval of detailed design drawings
  • Material procurement and parts manufacturing
  • Assembly, inspection, and testing
  • Final inspection before shipment
  • Transportation and delivery preparation
3~8Month
STEP04

Delivery

We ensure reliable installation and operational verification.
  • We conduct on-site installation work
  • Equipment installation, piping connections, and electrical work
  • Operational verification through comprehensive trial runs
  • We provide operation explanations and maintenance guidance
  • Final confirmation and handover in the presence of customers
Post-Delivery Support
  • Regular inspection and maintenance services
  • Technical support and troubleshooting
  • Parts supply and after-sales service
  • Equipment improvement and expansion proposals

Comprehensive Service to Reduce Customer Burden

Our strength lies in our ability to handle everything from design to manufacturing, construction, and trial operation comprehensively.

Benefits of Comprehensive Service

Cost Reduction
No need to place orders with multiple vendors, reducing costs
Quality Assurance
Consistent quality control provides high-quality systems
Shortened Construction Period
Efficient process management shortens delivery times
Clear Responsibility
Single point of contact with clear responsibility
After-Sales Service
Establishment of long-term support structure

Please Feel Free to Consult with Us First

If you have any concerns regarding powder transport equipment or valves, please feel free to contact us first.
Our engineers with extensive experience and proven track record will provide optimal proposals to solve your challenges.

ページトップ